Building works on Level 3
Commencing Friday 4 September until Wednesday 9 September, there will be extensive electrical work undertaken in the Level 3 Barr Smith Library 24-hour space to install new lighting. Therefore, part of the floor will be cordoned off and inaccessible during this period. The High Use Collection and seating in the front area of the space are still accessible 24/7 (with swipe card access required after hours). Access is also still available for the lift and all northern stairwells.
Thank you for your patience during this time.